Bautzen Reservoir

The reservoir Bautzen with its two dam constructions is sealed with an asphalt lining. Both linings have a surface of est. 35.000 m² and were rehabilited in the early 2000. As a regular maintenance measure the mastic sealing was renewed to protect the asphalt lining from external impacts.

Taking advantage of the low water level during the works, CMC conducted an assessment of the asphalt lining.

Time period

2017

  • Design
  • Support to the client within bidding process
  • Surveillance during construction works
  • Quality assurancem
  • Assessment of the asphalt sealing