Ohra Reservoir
On the basis of an assessment of the asphalt lining in 2018, CMC developed repair and maintenance concepts (preliminary design). Those were further put in concrete terms in a schematic design and implementation planning. Subsequently, in 2019 the measures were executed: repair of local deficiencies and renewal of the mastic sealing.
Eckdaten
Kea data
2018-2019
Rendered services
- Assessmnt of the asphalt lining
- Preliminary design
- Schematic design
- Support within the approval procedures
- Implementation planning
- Support within the bidding process
- Site and quality surveillance
Client
Thüringer Fernwasserversorgung