Ohra Reservoir

On the basis of an assessment of the asphalt lining in 2018, CMC developed repair and maintenance concepts (preliminary design). Those were further put in concrete terms in a schematic design and implementation planning. Subsequently, in 2019 the measures were executed: repair of local deficiencies and renewal of the mastic sealing.

Kea data

2018-2019

  • Assessmnt of the asphalt lining
  • Preliminary design
  • Schematic design
  • Support within the approval procedures
  • Implementation planning
  • Support within the bidding process
  • Site and quality surveillance

Thüringer Fernwasserversorgung